The Second-Generation Tesla Roadster
From the 2017 promise of 620 miles to a 2028 production date. Here is what changed.
The car was revealed again on 15 October 2026. Production is now 2028. Range is over 300 miles. The flying version is not road-legal.

Three numbers
- 2028 — production start stated at the 15 October 2026 event. The 2017 claim was 2020. Source: Tesla and event reports.
- Over 300 miles — claimed range for the 2026 versions. The 2017 claim was 620 miles. Source: Tesla.
- $50,000 — reservation for the Performance version. Thrust is $250,000. Source: Tesla reservation page.
What the data shows
A common claim is that the second-generation Tesla Roadster will deliver the numbers Tesla published in November 2017. The fact is that those numbers have been revised. In 2017 Tesla said the car would do 0-60 mph in 1.9 seconds, travel 620 miles on a 200 kWh battery, exceed 250 mph, seat four, cost $200,000, and enter production in 2020. At the 15 October 2026 event at SpaceX’s McGregor facility, Tesla showed three versions. Production is now set for 2028. Range is over 300 miles. Top speed is over 230 mph. Seating is two, or one in the top version. No purchase price was announced.
The three versions are Performance, Thrust, and Rocket. Performance is labeled road ready. It seats two, uses active aerodynamics and a multi-mode suction system, claims 0-60 mph under 1.6 seconds, and can be reserved for $50,000. Thrust is labeled race ready. It adds rear cold-gas thrusters, claims under 0.9 seconds (an event demonstration was clocked at 0.81 seconds), and costs $250,000 to reserve. Rocket is labeled air ready. It seats one, uses thrusters positioned around the body, claims under 0.59 seconds, and is invite-only. Tesla states that the Rocket is not approved for public road use. The thrusters are cold-gas systems that use compressed air for short bursts. They are not sustained flight.
The 2017 reservation structure is partly intact. A Performance reservation is still $50,000, paid as $5,000 up front and $45,000 within 10 days. The Thrust reservation is $250,000. How existing 2017 deposits convert is not stated. Tesla opened reservations in the United States and China after the event. The company has not published a final price for any version. Musk said at the event that the Roadster would be the last human-driven car Tesla makes. The production date is eight years later than the one given in 2017.
The Rocket version is invite-only and not approved for public roads. Cold-gas thrusters provide short bursts.
| Count | Figure | What it is |
|---|---|---|
| Production | 2028 | Was 2020 in 2017 |
| Range | over 300 miles | Was 620 miles |
| Performance 0-60 | under 1.6 s | Road-ready version |
| Thrust reservation | $250,000 | Limited release |
| Rocket | invite only | Not approved for public roads |
How it was measured
The 2017 figures come from Tesla’s November 2017 unveil and the Roadster page that followed. The 2026 figures come from Tesla’s statements and reservation page at the 15 October 2026 event. Range and acceleration claims are manufacturer statements. They are not EPA-certified results. The 0.81-second demonstration used thrusters at the event.
A reservation is a deposit, not a purchase price. Tesla has not published a final price. The Rocket version is described by Tesla as not approved for public road use. Cold-gas thrusters use compressed air for short-duration thrust. They are not a continuous flight system.
What it means
It is settled that production is now stated for 2028, that the claimed range is over 300 miles, and that the Rocket version is invite-only and not road-approved. It is not settled that any version will meet the 2017 numbers. Use 2028 for production. Use over 300 miles for range. Use $50,000 for the Performance reservation. Do not treat the 2017 claims as current specifications.
Common misreadings
- Production is 2028, not 2020.
- Range is over 300 miles, not 620.
- The flying Rocket version is not approved for public roads.
Where the numbers come from
How we built this
- Dataset: Tesla’s 2017 unveil statements and 2026 event statements and reservation page.
- Scope: Manufacturer claims kept apart from certified results. The Rocket version kept separate from the road-legal Performance version.
- Figures: 2028 is the stated production year. Over 300 miles is the 2026 range claim. $50,000 is the Performance reservation. The 2017 figures are treated as superseded.




